Specialty Markets

Condo Sales: HOA Documents and Approvals

Condo deals without surprises: which HOA documents to get, how to read them, lender project reviews and warrantability, and red flags to catch early.

AssistCall research teamPublished Reviewed by Faruque Amin, VP of Sales and Marketing7 min read

On this page
  1. Why condo deals fail late
  2. The documents to request
  3. Questions to ask before writing the offer
  4. Reading the package like a buyer's advocate
  5. Project reviews and warrantability
  6. The lender's condo questionnaire
  7. Advice for listing agents
  8. Frequently asked questions
  9. References
Specialty Markets: Condo Sales: HOA Documents and ApprovalsArticle coverSPECIALTY MARKETSCondo Sales: HOADocuments and ApprovalsAva for Real Estate TeamsInsightsSpecialty Markets: Condo Sales: HOA Documents and ApprovalsArticle coverSPECIALTY MARKETSCondo Sales: HOADocuments andApprovalsAva for Real Estate Teams

Key takeaways

  • Community associations are everywhere: about 373,000 in the US, home to roughly 78.1 million residents[1].
  • Order the association's documents and the lender's condo questionnaire at contract, because they drive both the buyer's decision and loan approval.
  • Lenders review the project, not just the unit. A building that fails a project review can sink a financed sale even when the buyer is strong.
  • Read the budget, reserves, minutes, insurance and any special assessments; that is where most condo problems show up first.

Why condo deals fail late

In a condo sale, the buyer is buying two things: a unit and a share of a building run by an association. The unit can be perfect and the deal can still fail because of the building's finances, insurance, litigation or ownership mix. Those problems often surface late, when the lender's project review comes back or the buyer finally reads the minutes.

Associations are a large part of US housing. The Community Associations Institute estimates there are about 373,000 community associations, home to about 78.1 million residents[1]. Condos are one type; homeowners associations in planned communities and cooperatives are others. Many of the steps below apply to all of them, but condo financing has the most specific rules.

Financing problems are already the top reason deals fall apart. In Zillow's 2026 research, 47% of sellers had at least one offer fall through, and financing issues were cited by 44% of those sellers[2]. In condo transactions, a failed project review is one of the most common financing problems, and one of the most avoidable.

The documents to request

State law usually sets which documents a seller or association must provide, how fast and at what cost, and some states give buyers a review period after delivery. Know your state's rules and put the delivery date in the transaction timeline. At a minimum, ask for the following.

Association documents to request in a condo sale and what to check in each
DocumentWhat to look for
Declaration and bylawsUse restrictions, rental rules, pet rules, who maintains what
Rules and regulationsMove-in rules, parking, renovations, short-term rentals
Current budget and financial statementsIncome, expenses, delinquencies, operating deficit
Reserve study and reserve balanceWhether savings match the cost of future repairs
Board minutes, last 12 to 24 monthsPlanned projects, disputes, insurance claims, assessments under discussion
Master insurance policyCoverage type, deductibles, what the unit owner must insure
Special assessmentsApproved or proposed, amount per unit, payment schedule
Litigation disclosureAny lawsuits involving the association, especially construction defects
Resale certificate or estoppel letterDues owed, violations, transfer fees, assessments

Listing agents can speed things up by ordering the resale package as soon as the listing is signed, where state law and cost allow. Buyers' agents should put a document review contingency in the offer with a clear deadline that starts on delivery, not on acceptance.

Questions to ask before writing the offer

Buyers' agents can save weeks by asking a few questions before the offer, not after. Most of them can be answered by the listing agent, the seller or the management company in a single call, and the answers change how you write the offer.

  1. What are the monthly dues, what do they cover, and have they gone up in the last two years?
  2. Are there any approved or proposed special assessments, and who pays them if they are approved before closing?
  3. Is the project on the FHA or VA approved list, if the buyer is using one of those loans?
  4. Are there any rental restrictions, minimum lease terms or caps on the number of rented units?
  5. Is there any litigation involving the association or the developer?
  6. Who completes lender questionnaires, what is the fee and how long does it take?
  7. Are there transfer fees, capital contributions or move-in deposits, and who pays them under local custom?

Write the answers into the offer where they matter. If an assessment is under discussion, state who pays it if it is approved before closing. If the buyer is relying on renting the unit, make the offer contingent on confirming that the rules allow it. If the lender's project review is uncertain, give the financing contingency enough time to cover it.

For buyers coming from single-family homes, explain how life in an association differs: shared walls and rules, a board that can raise dues, and limits on renovations or pets. Some buyers love the trade-off; others discover too late that they do not.

Reading the package like a buyer's advocate

Few buyers read every page, so help them focus. The budget and reserves tell you whether dues are likely to rise. The minutes tell you what the board is worried about. The insurance tells you who pays when something goes wrong. Together they show whether the building is well run or heading for a large special assessment.

  • Reserves that are low compared with the reserve study's recommendation suggest higher dues or an assessment ahead.
  • A high share of owners behind on dues strains the budget and can affect lender approval.
  • Minutes that mention roof, facade, balcony, elevator or plumbing projects without funding are an early warning.
  • A master policy with a large deductible may leave unit owners paying a share after a loss.
  • Litigation involving construction defects or a major claim can make financing difficult until resolved.
  • Rental caps or short-term rental bans matter to investor buyers and to owners who may need to rent later.

Some states have added structural inspection or reserve requirements for older condo buildings. Where they apply, ask for the latest inspection reports and reserve studies, and check whether required repairs are funded. Your role is to point the buyer to the documents and the questions, and to suggest an attorney or the association's manager for anything you cannot answer.

Project reviews and warrantability

For a financed purchase, the lender reviews the condo project as well as the buyer. Under Fannie Mae's Selling Guide, the review method depends on the unit and project type: an attached unit in an established project can use a Full Review, an FHA project approval or a streamlined Fannie Mae review, while new or newly converted projects need a Full Review with Fannie Mae's Condo Project Manager or a standard Fannie Mae review[3]. Detached condo units and units in two- to ten-unit projects generally have the project review waived, subject to basic requirements[3].

Whether a project counts as established matters. Fannie Mae treats a project as established when at least 90% of units have been conveyed to purchasers, the project is fully complete with no further phasing and control of the association has passed to the owners[3]. A Full Review of an established project must be completed within one year before the note date, and for a new project within 180 days[3].

Maximum age of a Fannie Mae Full Review before the note dateFannie Mae states one year for established projects and 180 days for new projects
Maximum age of a Fannie Mae Full Review before the note dateComparison. Established project: 365 days; New project: 180 days.365 daysEstablished projectEstablished project: 365 days180 daysNew projectNew project: 180 daysMaximum age of a Fannie Mae Full Review before the note dateComparison. Established project: 365 days; New project: 180 days.365 daysEstablished projectEstablished project: 365 days180 daysNew projectNew project: 180 days

Source: Fannie Mae, 2026[3]

Show the data
ItemValue
Established project365 days
New project180 days

Government loans have their own lists. VA-backed loans can be used for a condo only if it is in a VA-approved project[4], and FHA loans need an FHA-approved project or a single-unit approval. Before a buyer writes an offer, ask the lender to check the project against the loan program the buyer will use.

The lender's condo questionnaire

Lenders send the association a questionnaire covering ownership, delinquencies, insurance, litigation, commercial space and other items. A slow or incomplete answer can delay closing by weeks. Treat it as a critical path item.

  1. Identify the manager on day one

    Get the name, email and phone of the management company or board contact who completes questionnaires, and their fee and turnaround time.

  2. Send the lender the contact early

    Ask the loan officer to send the questionnaire the day the contract is signed, not after the appraisal.

  3. Follow up on a schedule

    Check in every few days until it is returned. Offer to pay the fee upfront if that speeds it up.

  4. Review the answers with the lender

    Ask whether any answer creates a problem for the loan program, and what can fix it.

  5. Plan for a fallback

    If the project does not qualify, discuss other loan options, such as a portfolio loan, before deadlines run out.

Example: a buyer's agent learns at contract that the building's management company takes ten business days to answer questionnaires. She asks the lender to order it immediately, pays the rush fee with the buyer's approval and gets the answers back in four days. The lender flags a pending roof assessment, which the parties resolve with a seller credit before the appraisal.

Advice for listing agents

Condo listing agents can prevent most late failures by gathering information before the first showing. Ask the seller for their copy of the governing documents and recent statements, contact the manager to learn the questionnaire process and fees, and find out whether the project is on FHA and VA approval lists. Include the monthly dues, what they cover and any approved assessments in the listing.

If the building has known issues, plan for them. A building with litigation or low reserves may still sell well to cash buyers or with portfolio lenders, but the price and marketing should reflect that. Tell buyers' agents early; they will find out anyway, and surprises late in a deal destroy trust. For co-op buildings with board approval, see co-op sales and board approvals in New York, and for newly built condos, representing buyers in new construction.

Frequently asked questions

What documents should a condo buyer review?

The declaration, bylaws, rules, budget and financial statements, reserve study, recent board minutes, master insurance policy, any special assessments, litigation disclosures and the resale certificate or estoppel letter.

What makes a condo non-warrantable?

A project that does not meet the lender's or Fannie Mae's eligibility rules, for example because of ownership concentration, litigation, delinquencies, insurance gaps or incomplete construction. The lender's project review decides.

Can I use a VA or FHA loan for any condo?

No. VA loans require a condo in a VA-approved project, and FHA loans need an FHA-approved project or a single-unit approval. Check the project before writing an offer.

How long does a condo questionnaire take?

It depends on the management company. Some return it in days, others take weeks. Ask about turnaround and fees on day one and order it as soon as the contract is signed.

References

  1. Foundation for Community Association Research (2025). National and State Statistical Review (Community Association Fact Book 2025) (opens in a new tab) ↑

  2. Zillow Research (2026). Sellers: Results from the Zillow Consumer Housing Trends Report 2026 (opens in a new tab) ↑

  3. Fannie Mae (2026). Selling Guide B4-2.1-01, General Information on Project Standards (opens in a new tab) ↑

  4. U.S. Department of Veterans Affairs (2026). VA-backed purchase loan (opens in a new tab) ↑

Book a demo

See Ava handle your calls.

Book a short demo. We’ll walk through your calls and workflow, and agree what Ava should take care of.

Book a demo